Quick Answer

Langer manages turnkey pallet rack projects across Pittsburgh and Western Pennsylvania — one point of contact coordinating design, stamped permits, delivery, installation, and the sprinkler and electrical trades so your rack project lands on time and on budget. Call 724-898-2000 to scope your project.

Stamped Permit Drawings
Certified Install Crews
24-Hour Rack Repair
Western PA Since 1984

Pallet Rack Project & Installation Management in Western PA

A warehouse rack project has a lot of moving parts — engineering, permits, rack lead times, install crews, sprinkler and electrical trades, and your own operations schedule. Langer gives you a single project manager who owns all of it. We build the timeline, sequence the stamped permit drawings ahead of delivery, coordinate the sub-trades so in-rack sprinklers and lighting land in the right order, phase the install around your picking, and run the punch list to closeout. You get one accountable contact instead of chasing a vendor, an engineer, and three trades — and a project that opens on schedule across Pittsburgh and all of Western Pennsylvania.

724-898-2000
What's Included
  • A single project manager and point of contact, start to finish
  • Master schedule covering design, permits, delivery, and install
  • Stamped permit drawings sequenced ahead of the install
  • Coordination of sprinkler, electrical, and other sub-trades
  • Rack lead-time tracking and delivery scheduling
  • Phased installation planned around your live operation
  • On-site supervision, safety, and quality control
  • Punch list, final walk-through, and closeout documentation

More Turnkey Racking Services

See All Pallet Racking Systems

Project Management — Common Questions

What does pallet rack project management include?

It is end-to-end ownership of your rack project: design and space planning, stamped permit drawings, rack procurement and delivery scheduling, installation, and coordination of the sprinkler, electrical, and other trades — all run to a single master schedule by one Langer project manager. You get one accountable contact across Pittsburgh and Western PA instead of juggling several vendors. Call 724-898-2000.

Do I get a single point of contact?

Yes — that is the whole point. One project manager owns the schedule, the trades, the permit, and the install, and is your single number to call for status or changes. It eliminates the finger-pointing that happens when the rack supplier, the engineer, and the installers are three separate companies.

Can you coordinate sprinkler and electrical trades around the rack?

Yes. In-rack sprinklers, lighting, and power often have to be installed in a specific sequence relative to the rack — get the order wrong and work has to be redone. We coordinate those trades into the master schedule so each one shows up at the right stage, and so the fire-protection design and the rack layout are approved together.

Can the installation be phased so we keep operating?

Yes. For occupied facilities we phase the work zone by zone, scheduling disruptive tasks outside pick hours and keeping forklift lanes clear, so you keep shipping while the project proceeds. The phasing plan is built into the schedule from the start.

How do you keep a rack project on time and on budget?

By sequencing the long-lead items first — permits and rack fabrication — and tracking them against a master schedule, so nothing waits on a surprise. Scope and pricing are defined up front as line items, change orders are documented, and a single manager catches conflicts between trades before they become delays or cost overruns.

Is project management worth it for a smaller rack job?

For a simple drop-and-install of a few bays, often the install service alone is enough. Project management earns its keep when there are permits, multiple trades, tight timelines, or a live operation to work around — which is most distribution-center and facility-expansion projects. We will tell you honestly which your project needs. Call 724-898-2000.

Pallet Rack Project & Installation Management — Western Pennsylvania
Designed · Engineered · Installed · Repaired · Permit drawings · Pittsburgh & all of Western PA
724-898-2000

Areas We Serve

Family-owned in Valencia, PA since 1984 — Langer provides forklift sales, service, parts, and warehouse solutions across Pittsburgh and all of Western Pennsylvania.

PittsburghCranberry TownshipButlerMonroevilleWashington

We also serve Allegheny County, Butler County, Washington County, Westmoreland County, Beaver County, Lawrence County, Armstrong County, and the surrounding Western Pennsylvania communities. Don't see your town? Call 724-898-2000 — if you're in our region, we cover you.

Whoa there — that's our content. Let's not lift it without asking. 📞 724-898-2000